What a kitchen remodel costs in San Diego, line by line
Replacing a 150 sq ft kitchen without moving anything in San Diego County comes to about $43,250, with an expected range of $38,075 to $52,775. Our samples run from $18,675 to $103,150. This is a modeled figure from our price list, last updated November 2026, not a contractor's quote. Appliances are extra, apart from the range hood and its vent.
Last updated
118 lin ft245 sq ft330 sq ft
Sample job
Everything new, same layout
Most likely$43,250
$38,075Expected range$52,775
Samples run
$18,675 to $103,150
3 of the sample's 25 lines, marked on the drawing
1Stock base cabinet, supplied and installed18 lin ft$3,892
2Quartz countertop, templated, fabricated and installed45 sq ft$3,704
3Tile backsplash, supplied and installed30 sq ft$409
Sample jobs
Same cabinets, new face
Most likely$21,200
Expected range$18,675 to $25,875
Everything new, same layout
Most likely$43,250
Expected range$38,075 to $52,775
Full gut with a new layout
Most likely$84,550
Expected range$74,425 to $103,150
Expected range on one scale
Same cabinets, new face
Everything new, same layout
Full gut with a new layout
$18,675Most likelyExpected range$103,150
These are sample jobs, not quotes. Your rooms, quantities and contractor set the real price.
Prices use San Diego County labor and material costs. Homes elsewhere in the US can still get an estimate, and it will say that local costs can differ.
These samples aren't your job. HowMuch prices yours from your own answers and photos, and the line-by-line estimate of your own job, with your quantities, is free for now. Price my kitchen
Every line of each sample
Same cabinets, new face$21,200
Demolition
Work
Qty
Amount
Remove existing countertopThe old 40 sq ft counter comes off the cabinets.
40 sq ft
$76
Site work
Work
Qty
Amount
Debris haul-away and dump fees, per truck loadOne truck load covers the old counter and scraps.
1 load
$524
Cabinets & counters
Work
Qty
Amount
Reface existing cabinet boxes — new doors, drawer fronts, veneerThe boxes stay, and 28 feet get new doors and veneer.
28 lin ft
$5,298
Cabinet pull or knob, supplied and installedOne pull or knob for each of 28 doors and drawers.
28
$421
Quartz countertop, templated, fabricated and installedNew quartz covers the same 40 sq ft of counter.
40 sq ft
$3,292
Tile backsplash, supplied and installedTile runs along 30 sq ft of wall above the counter.
30 sq ft
$409
Fixtures & appliances
Work
Qty
Amount
Sink, supplied and installedA new sink goes into the new quartz top.
1
$330
Faucet or shower valve trim, supplied and installedOne new kitchen faucet goes in with the sink.
1
$255
Install customer-supplied appliance (range, dishwasher, hood)Your own dishwasher goes back in once the counters are set.
1
$118
Plumbing
Work
Qty
Amount
Replace angle stop / shutoff valveHot and cold stops under the sink get replaced.
2
$138
Electrical
Work
Qty
Amount
Under-cabinet LED lighting runLED strips run 12 feet under the wall cabinets.
12 lin ft
$463
Painting
Work
Qty
Amount
Interior walls — patch, prime as needed, two coatsAbout 300 sq ft of wall gets two fresh coats.
300 sq ft wall
$262
Masking, floor protection, and daily cleanupOne room to mask, protect and clean up daily.
1 room
$67
Line amounts are before material handling, site conditions, project coordination, overhead and profit, and contingency. The rows below add those and reach the most likely figure.
How the lines become the most likely figure
Materials (incl. handling)
$5,931
Labor
$6,627
Site conditionsoccupied home
$331
Project coordination4 trades on one job
$3,867
Overhead & profit
$2,513
Contingencyfor what turns up once work starts
$1,927
Rounding / job minimum
$4
Most likely
$21,200
Where the money goes
Materials (incl. handling)28%
Labor & site conditions33%
Project coordination18%
Overhead & profit12%
Contingency9%
Rounding / job minimum<1%
Everything new, same layout$43,250
Demolition
Work
Qty
Amount
Gut a kitchen — cabinets, counters, appliances, finishes outCabinets, counters, appliances and finishes all come out.
1
$716
Remove sheet vinyl / VCT and adhesiveAbout 150 sq ft of sheet vinyl comes up first.
150 sq ft
$212
Subfloor prep
Work
Qty
Amount
Standard foam underlaymentFoam underlayment goes under all 150 sq ft of plank.
150 sq ft
$81
New flooring
Work
Qty
Amount
Luxury vinyl plank — mid grade (20 mil wear layer)Mid-grade vinyl plank replaces the sheet vinyl, 150 sq ft.
150 sq ft
$771
Trim & transitions
Work
Qty
Amount
Paint-grade baseboard, 3-1/4", supplied and installedTwenty feet of new base where cabinets don't cover wall.
20 lin ft
$100
Site work
Work
Qty
Amount
Debris haul-away and dump fees, per truck loadTwo truck loads for cabinets, counters and old flooring.
2 loads
$1,048
Cabinets & counters
Work
Qty
Amount
Stock base cabinet, supplied and installedEighteen feet of stock base cabinets on the same walls.
18 lin ft
$3,892
Stock wall cabinet, supplied and installedTwelve feet of stock wall cabinets above the counters.
12 lin ft
$1,898
Cabinet pull or knob, supplied and installedThirty pulls and knobs for the new doors and drawers.
30
$451
Quartz countertop, templated, fabricated and installedQuartz counters cover about 45 sq ft of new cabinets.
45 sq ft
$3,704
Tile backsplash, supplied and installedA tile backsplash on about 30 sq ft of wall.
30 sq ft
$409
Fixtures & appliances
Work
Qty
Amount
Sink, supplied and installedOne new sink set in the quartz counter.
1
$330
Faucet or shower valve trim, supplied and installedOne new faucet to match the new sink.
1
$255
Install customer-supplied appliance (range, dishwasher, hood)Four appliances you buy get hooked up here.
4
$472
Range hood with new exterior vent runA range hood with a new vent run outside.
1
$664
Plumbing
Work
Qty
Amount
Replace angle stop / shutoff valveThree new stops for the sink and dishwasher lines.
3
$207
Framing & drywall
Work
Qty
Amount
Hang, tape, and finish drywall to level 4About 100 sq ft of wall gets new drywall after demo.
100 sq ft wall
$166
Painting
Work
Qty
Amount
Interior walls — patch, prime as needed, two coatsWalls get two coats across about 300 sq ft.
300 sq ft wall
$262
Interior ceiling — two coats flatThe 150 sq ft ceiling gets two flat coats.
150 sq ft
$131
Masking, floor protection, and daily cleanupThe kitchen is masked and cleaned up each day.
1 room
$67
Electrical
Work
Qty
Amount
New dedicated circuit from the panelTwo dedicated circuits run from the panel for appliances.
2
$690
New outlet on an existing circuitFour added outlets along the new counters.
4
$596
New switch or dimmer on an existing circuitTwo new switches for the new lighting.
2
$365
Recessed LED can light, supplied and installedSix LED recessed lights across the ceiling.
6
$683
Under-cabinet LED lighting runTwelve feet of LED lighting under the wall cabinets.
12 lin ft
$463
Line amounts are before material handling, site conditions, project coordination, overhead and profit, and contingency. The rows below add those and reach the most likely figure.
How the lines become the most likely figure
Materials (incl. handling)
$11,559
Labor
$8,837
Site conditionsoccupied home, permit likely
$972
Project coordination6 trades on one job
$12,821
Overhead & profit
$5,128
Contingencyfor what turns up once work starts
$3,932
Rounding / job minimum
$1
Most likely
$43,250
Where the money goes
Materials (incl. handling)27%
Labor & site conditions23%
Project coordination29%
Overhead & profit12%
Contingency9%
Rounding / job minimum<1%
Full gut with a new layout$84,550
Demolition
Work
Qty
Amount
Gut a kitchen — cabinets, counters, appliances, finishes outEverything comes out before the layout changes.
1
$716
Demo existing tile and thinset (labor intensive)About 220 sq ft of old floor tile comes up.
220 sq ft
$605
Remove a non-bearing wall and patch backTen feet of non-bearing wall comes out and gets patched.
10 lin ft
$538
New flooring
Work
Qty
Amount
Porcelain tile, supplied and installed (standard layout)Porcelain tile goes over the full 220 sq ft.
220 sq ft
$2,580
Trim & transitions
Work
Qty
Amount
Paint-grade baseboard, 3-1/4", supplied and installedThirty feet of base along the exposed walls.
30 lin ft
$150
Site work
Work
Qty
Amount
Debris haul-away and dump fees, per truck loadTwo truck loads for the cabinets, tile and wall debris.
2 loads
$1,048
Cabinets & counters
Work
Qty
Amount
Semi-custom cabinetry, supplied and installedThirty-six feet of semi-custom cabinets in the new layout.
36 lin ft
$10,449
Kitchen island cabinet base, installedOne island base added in the new layout.
1
$1,967
Cabinet pull or knob, supplied and installedForty pulls and knobs for the larger cabinet run.
40
$602
Quartz countertop, templated, fabricated and installedAbout 70 sq ft of quartz, island included.
70 sq ft
$5,762
Tile backsplash, supplied and installedForty sq ft of tile along the new counter run.
40 sq ft
$545
Fixtures & appliances
Work
Qty
Amount
Sink, supplied and installedA new sink goes in at its new spot.
1
$330
Faucet or shower valve trim, supplied and installedA new faucet goes with the moved sink.
1
$255
Install customer-supplied appliance (range, dishwasher, hood)Four of your own appliances go in the new layout.
4
$472
Range hood with new exterior vent runThe hood moves with the range and gets a new vent.
1
$664
Plumbing
Work
Qty
Amount
Move an existing fixture to a new locationThe sink moves, so its supply and drain move too.
1
$846
Replace angle stop / shutoff valveThree fresh stops on the rerouted water lines.
3
$207
New gas line run to an applianceTwenty feet of gas line to reach the range.
20 lin ft
$337
Framing & drywall
Work
Qty
Amount
Hang, tape, and finish drywall to level 4New drywall on about 220 sq ft of opened wall.
220 sq ft wall
$366
Painting
Work
Qty
Amount
Interior walls — patch, prime as needed, two coatsTwo coats on about 420 sq ft of wall.
420 sq ft wall
$367
Interior ceiling — two coats flatTwo flat coats on the 220 sq ft ceiling.
220 sq ft
$192
Masking, floor protection, and daily cleanupTwo rooms to mask, the kitchen and the opened-up space.
2 rooms
$135
Electrical
Work
Qty
Amount
New dedicated circuit from the panelFour dedicated circuits for appliances and the island.
4
$1,379
New outlet on an existing circuitEight outlets for the new counters and island.
8
$1,192
New switch or dimmer on an existing circuitThree switches for the new lighting zones.
3
$548
Recessed LED can light, supplied and installedEight recessed lights spaced for the new layout.
8
$911
Under-cabinet LED lighting runSixteen feet of LED strip under the new wall cabinets.
16 lin ft
$617
Hardwired smoke / CO detector, interconnectedFour hardwired alarms, since permitted work can trigger updates.
4
$715
Line amounts are before material handling, site conditions, project coordination, overhead and profit, and contingency. The rows below add those and reach the most likely figure.
How the lines become the most likely figure
Materials (incl. handling)
$22,663
Labor
$15,288
Site conditionsoccupied home, permit likely, moving plumbing
$3,822
Project coordination6 trades on one job
$25,064
Overhead & profit
$10,026
Contingencyfor what turns up once work starts
$7,686
Rounding / job minimum
$1
Most likely
$84,550
Where the money goes
Materials (incl. handling)27%
Labor & site conditions22%
Project coordination30%
Overhead & profit12%
Contingency9%
Rounding / job minimum<1%
What moves the price
Each change is priced on this sample: Everything new, same layout.
The appliances themselves, apart from the range hood (we price installing them)
Permit fees
Design and drawings
Load-bearing walls and engineering
Testing and cleanup for lead or asbestos
Hidden damage
A temporary kitchen
San Diego notes
Painting, flooring and cabinets don't need a building permit in the City of San Diego. Adding circuits, replacing a water heater and installing HVAC need a permit. Swapping a switch, light fixture or receptacle doesn't. Other cities in the county run their own rules. City of San Diego permit guide
The exemptions don't apply to historical resources or to environmentally sensitive lands that need a development permit. San Diego Municipal Code §129.0203
About 48% of the county's homes were built before 1980. CSLB's guidance sets no age cutoff. Material the work will disturb is tested or assumed to contain asbestos. Census ACS 2024, table B25034CSLB asbestos guide
Paid work in a pre-1978 home that disturbs more than 6 square feet of interior paint in a room, and any window replacement, falls under EPA's lead-safe rule. EPA lead-safe rule questions
Permitted interior work can trigger smoke and carbon monoxide alarm updates; ask your building department.
Common questions
How much does a kitchen remodel cost in San Diego?
Replacing a 150 sq ft kitchen without moving anything comes to about $43,250 on our price list, with an expected range of $38,075 to $52,775. Appliances aren't included, apart from the range hood and its vent.
Does this include appliances?
Mostly no. The samples price installing your appliances, not buying them. The exception is the range hood: where a sample runs a new vent outside, the hood is part of that line.
Do I need a permit?
In the City of San Diego, cabinets, flooring and paint don't need a building permit, but adding circuits does, and electrical, plumbing and mechanical work is permitted separately. Other cities in the county run their own rules. Permit fees aren't in these figures.
What saves the most?
On the sample above, laminate counters instead of quartz saves the most: $6,025.
What is the project coordination row?
A job that brings several trades into the home carries the cost of running them: scheduling, supervision, protecting the rest of the home and return trips. We add 15% of the materials, labor and site conditions for each trade past the second, up to 60%, before overhead and profit. Replacing a 150 sq ft kitchen without moving anything needs 6 trades (cabinets & counters, electrical, flooring, framing & drywall, painting and plumbing & fixtures), so its row comes to $12,821.
Why will a contractor's bid differ?
A contractor sets the real price after seeing the property. Our price list starts from San Diego County wage data and shelf prices, then adds 15% overhead and profit, and project coordination on a job with more than two trades. A firm with a showroom, designers and project managers has higher overhead and can bid well above this.
Get this list for your own kitchen
Answer a few questions and send photos. The full line-by-line estimate of your own job, with your quantities, is free for now, no card needed.
AI drafts the list of work; every price comes from our price list.