What an electrical panel upgrade costs in San Diego

Upgrading a 100-amp panel to 200 amps in San Diego County comes to about $3,325, with an expected range of $2,950 to $4,075. Our samples run from $2,950 to $12,475. This is a modeled figure from our price list, last updated November 2026, not a contractor's quote.

Last updated

Sample job

100 amp to 200 amp, same spot

Most likely$3,325

Samples run
$2,950 to $12,475

The sample's one line, marked on the drawing

  1. Main panel upgrade to 200A — permit and utility coordination1 panel$2,304

Sample jobs

100 amp to 200 amp, same spot

Most likely$3,325

Expected range$2,950 to $4,075

Panel, EV outlet and two circuits

Most likely$5,250

Expected range$4,625 to $6,425

Panel, subpanel and two rooms of old wiring

Most likely$10,225

Expected range$9,000 to $12,475

These are sample jobs, not quotes. Your rooms, quantities and contractor set the real price.

Prices use San Diego County labor and material costs. Homes elsewhere in the US can still get an estimate, and it will say that local costs can differ.

What's in the panel line: 200-amp meter-main, moving about 20 circuits, two ground rods, a whole-home surge device, SDG&E disconnect and reconnect coordination.

These samples aren't your job. HowMuch prices yours from your own answers and photos, and the line-by-line estimate of your own job, with your quantities, is free for now. Price my panel

Every line of each sample

100 amp to 200 amp, same spot$3,325
Electrical
WorkQtyAmount
Main panel upgrade to 200A — permit and utility coordinationA new 200-amp meter-main in the same spot, old panel out.1$2,304

Line amounts are before material handling, site conditions, overhead and profit, and contingency. The rows below add those and reach the most likely figure.

How the lines become the most likely figure
Materials (incl. handling)$1,642
Labor$913
Site conditionspermit required$73
Overhead & profit$394
Contingencyfor what turns up once work starts$302
Rounding / job minimum$1
Most likely$3,325
  • Materials (incl. handling)49%
  • Labor & site conditions30%
  • Overhead & profit12%
  • Contingency9%
  • Rounding / job minimum<1%
Panel, EV outlet and two circuits$5,250
Electrical
WorkQtyAmount
Main panel upgrade to 200A — permit and utility coordinationThe same 200-amp upgrade, done before the new circuits.1$2,304
EV charger circuit and receptacleA 14-50 outlet on its own circuit for an EV.1$651
New dedicated circuit from the panelTwo more dedicated circuits from the new panel.2$690

Line amounts are before material handling, site conditions, overhead and profit, and contingency. The rows below add those and reach the most likely figure.

How the lines become the most likely figure
Materials (incl. handling)$2,481
Labor$1,543
Site conditionspermit required$123
Overhead & profit$622
Contingencyfor what turns up once work starts$477
Rounding / job minimum$4
Most likely$5,250
  • Materials (incl. handling)47%
  • Labor & site conditions32%
  • Overhead & profit12%
  • Contingency9%
  • Rounding / job minimum<1%
Panel, subpanel and two rooms of old wiring$10,225
Electrical
WorkQtyAmount
Main panel upgrade to 200A — permit and utility coordinationThe panel upgrade comes first and feeds everything else.1$2,304
Subpanel, installed and fedOne subpanel, installed and fed from the main panel.1$761
New dedicated circuit from the panelThree new circuits from the panel to loaded rooms.3$1,034
Rewire a room — knob-and-tube or aluminum replacementTwo rooms of old wiring replaced with new cable.2 rooms$1,872
Hardwired smoke / CO detector, interconnectedFour interconnected alarms after the permitted wiring work.4$715

Line amounts are before material handling, site conditions, overhead and profit, and contingency. The rows below add those and reach the most likely figure.

How the lines become the most likely figure
Materials (incl. handling)$3,586
Labor$3,647
Site conditionspermit required, old wiring$839
Overhead & profit$1,211
Contingencyfor what turns up once work starts$928
Rounding / job minimum$14
Most likely$10,225
  • Materials (incl. handling)35%
  • Labor & site conditions44%
  • Overhead & profit12%
  • Contingency9%
  • Rounding / job minimum<1%

What moves the price

Each change is priced on this sample: Panel, EV outlet and two circuits.

ChangeEffect
Skip the EV outletsaves $925
Old wiring turns upadds $300
Add a subpaneladds $1,100

Where these figures come from: how we price an estimate. Have bids to weigh up? How to compare contractor bids.

What's not included

  • Permit fees
  • Any SDG&E charge for the service cable or meter
  • Underground service and trenching
  • Arc-fault upgrades on existing circuits
  • Stucco patching
  • The EV charger itself (we price the 14-50 outlet)

How the SDG&E part works

  • The final city or county inspection comes before SDG&E reconnects your power. SDG&E energization guide
  • For a meter panel upgrade, your electrician can schedule a same-day replacement and city inspection with SDG&E.
  • SDG&E's target for a main panel upgrade is 30 business days on average and 45 at most, for SDG&E's own work.

San Diego notes

  • Adding circuits, replacing a water heater and installing HVAC need a permit. Swapping a switch, light fixture or receptacle doesn't. Other cities in the county run their own rules. City of San Diego permit guide
  • Permitted interior work can trigger smoke and carbon monoxide alarm updates; ask your building department.

Common questions

How long does it take?

SDG&E's guide targets 30 business days on average and 45 at most for a main panel upgrade, counting only the work SDG&E is responsible for. Your electrician's schedule and the permit are separate.

Does SDG&E charge for this?

Any SDG&E charge isn't in these figures. Ask your electrician and SDG&E what applies to your home.

Do I need a permit?

Yes. The final inspection by the city or county comes before SDG&E reconnects your power. Other cities in the county run their own rules.

Do I need 200 amps for an EV?

It depends on your home's load. An electrician runs a load calculation to decide.