What an electrical panel upgrade costs in San Diego
Upgrading a 100-amp panel to 200 amps in San Diego County comes to about $3,325, with an expected range of $2,950 to $4,075. Our samples run from $2,950 to $12,475. This is a modeled figure from our price list, last updated November 2026, not a contractor's quote.
Last updated
Sample job
100 amp to 200 amp, same spot
Most likely$3,325
- Samples run
- $2,950 to $12,475
The sample's one line, marked on the drawing
- Main panel upgrade to 200A — permit and utility coordination1 panel$2,304
Sample jobs
100 amp to 200 amp, same spot
Most likely$3,325
Expected range$2,950 to $4,075
Panel, EV outlet and two circuits
Most likely$5,250
Expected range$4,625 to $6,425
Panel, subpanel and two rooms of old wiring
Most likely$10,225
Expected range$9,000 to $12,475
These are sample jobs, not quotes. Your rooms, quantities and contractor set the real price.
Prices use San Diego County labor and material costs. Homes elsewhere in the US can still get an estimate, and it will say that local costs can differ.
What's in the panel line: 200-amp meter-main, moving about 20 circuits, two ground rods, a whole-home surge device, SDG&E disconnect and reconnect coordination.
These samples aren't your job. HowMuch prices yours from your own answers and photos, and the line-by-line estimate of your own job, with your quantities, is free for now. Price my panel
Every line of each sample
100 amp to 200 amp, same spot$3,325
| Work | Qty | Amount |
|---|---|---|
| Main panel upgrade to 200A — permit and utility coordinationA new 200-amp meter-main in the same spot, old panel out. | 1 | $2,304 |
Line amounts are before material handling, site conditions, overhead and profit, and contingency. The rows below add those and reach the most likely figure.
| Materials (incl. handling) | $1,642 |
|---|---|
| Labor | $913 |
| Site conditionspermit required | $73 |
| Overhead & profit | $394 |
| Contingencyfor what turns up once work starts | $302 |
| Rounding / job minimum | $1 |
| Most likely | $3,325 |
- Materials (incl. handling)49%
- Labor & site conditions30%
- Overhead & profit12%
- Contingency9%
- Rounding / job minimum<1%
Panel, EV outlet and two circuits$5,250
| Work | Qty | Amount |
|---|---|---|
| Main panel upgrade to 200A — permit and utility coordinationThe same 200-amp upgrade, done before the new circuits. | 1 | $2,304 |
| EV charger circuit and receptacleA 14-50 outlet on its own circuit for an EV. | 1 | $651 |
| New dedicated circuit from the panelTwo more dedicated circuits from the new panel. | 2 | $690 |
Line amounts are before material handling, site conditions, overhead and profit, and contingency. The rows below add those and reach the most likely figure.
| Materials (incl. handling) | $2,481 |
|---|---|
| Labor | $1,543 |
| Site conditionspermit required | $123 |
| Overhead & profit | $622 |
| Contingencyfor what turns up once work starts | $477 |
| Rounding / job minimum | $4 |
| Most likely | $5,250 |
- Materials (incl. handling)47%
- Labor & site conditions32%
- Overhead & profit12%
- Contingency9%
- Rounding / job minimum<1%
Panel, subpanel and two rooms of old wiring$10,225
| Work | Qty | Amount |
|---|---|---|
| Main panel upgrade to 200A — permit and utility coordinationThe panel upgrade comes first and feeds everything else. | 1 | $2,304 |
| Subpanel, installed and fedOne subpanel, installed and fed from the main panel. | 1 | $761 |
| New dedicated circuit from the panelThree new circuits from the panel to loaded rooms. | 3 | $1,034 |
| Rewire a room — knob-and-tube or aluminum replacementTwo rooms of old wiring replaced with new cable. | 2 rooms | $1,872 |
| Hardwired smoke / CO detector, interconnectedFour interconnected alarms after the permitted wiring work. | 4 | $715 |
Line amounts are before material handling, site conditions, overhead and profit, and contingency. The rows below add those and reach the most likely figure.
| Materials (incl. handling) | $3,586 |
|---|---|
| Labor | $3,647 |
| Site conditionspermit required, old wiring | $839 |
| Overhead & profit | $1,211 |
| Contingencyfor what turns up once work starts | $928 |
| Rounding / job minimum | $14 |
| Most likely | $10,225 |
- Materials (incl. handling)35%
- Labor & site conditions44%
- Overhead & profit12%
- Contingency9%
- Rounding / job minimum<1%
What moves the price
Each change is priced on this sample: Panel, EV outlet and two circuits.
| Change | Effect |
|---|---|
| Skip the EV outlet | saves $925 |
| Old wiring turns up | adds $300 |
| Add a subpanel | adds $1,100 |
Where these figures come from: how we price an estimate. Have bids to weigh up? How to compare contractor bids.
What's not included
- Permit fees
- Any SDG&E charge for the service cable or meter
- Underground service and trenching
- Arc-fault upgrades on existing circuits
- Stucco patching
- The EV charger itself (we price the 14-50 outlet)
How the SDG&E part works
- The final city or county inspection comes before SDG&E reconnects your power. SDG&E energization guide
- For a meter panel upgrade, your electrician can schedule a same-day replacement and city inspection with SDG&E.
- SDG&E's target for a main panel upgrade is 30 business days on average and 45 at most, for SDG&E's own work.
San Diego notes
- Adding circuits, replacing a water heater and installing HVAC need a permit. Swapping a switch, light fixture or receptacle doesn't. Other cities in the county run their own rules. City of San Diego permit guide
- Permitted interior work can trigger smoke and carbon monoxide alarm updates; ask your building department.
Common questions
How long does it take?
SDG&E's guide targets 30 business days on average and 45 at most for a main panel upgrade, counting only the work SDG&E is responsible for. Your electrician's schedule and the permit are separate.
Does SDG&E charge for this?
Any SDG&E charge isn't in these figures. Ask your electrician and SDG&E what applies to your home.
Do I need a permit?
Yes. The final inspection by the city or county comes before SDG&E reconnects your power. Other cities in the county run their own rules.
Do I need 200 amps for an EV?
It depends on your home's load. An electrician runs a load calculation to decide.
Get this list for your own panel upgrade
Answer a few questions and send photos. The full line-by-line estimate of your own job, with your quantities, is free for now, no card needed. AI drafts the list of work; every price comes from our price list.
No sales calls unless you ask for contractor bids.