What a bathroom remodel costs in San Diego, line by line
Taking a 5x8 bathroom down to the studs in San Diego County comes to about $20,000, with an expected range of $17,600 to $24,375. Our samples run from $5,675 to $56,675. This is a modeled figure from our price list, last updated November 2026, not a contractor's quote.
Last updated
Sample job
5x8 bath to the studs, same layout
Most likely$20,000
- Samples run
- $5,675 to $56,675
3 of the sample's 21 lines, marked on the drawing
- Tile shower walls over waterproofing65 sq ft$1,355
- Porcelain tile, supplied and installed (standard layout)28 sq ft$328
- Standard alcove tub, supplied and installed1 tub$882
Sample jobs
Small hall bath, keep the tub
Most likely$6,450
Expected range$5,675 to $7,875
5x8 bath to the studs, same layout
Most likely$20,000
Expected range$17,600 to $24,375
Primary bath, tub out, tiled shower in
Most likely$46,450
Expected range$40,875 to $56,675
These are sample jobs, not quotes. Your rooms, quantities and contractor set the real price.
Prices use San Diego County labor and material costs. Homes elsewhere in the US can still get an estimate, and it will say that local costs can differ.
These samples aren't your job. HowMuch prices yours from your own answers and photos, and the line-by-line estimate of your own job, with your quantities, is free for now. Price my bathroom
Every line of each sample
Small hall bath, keep the tub$6,450
| Work | Qty | Amount |
|---|---|---|
| Remove sheet vinyl / VCT and adhesiveThe old 40 sq ft of sheet vinyl comes up. | 40 sq ft | $56 |
| Work | Qty | Amount |
|---|---|---|
| Ceramic tile, supplied and installed (standard layout)Ceramic tile replaces the vinyl across 40 sq ft. | 40 sq ft | $393 |
| Work | Qty | Amount |
|---|---|---|
| Debris haul-away and dump fees, per truck loadOne truck load takes the old fixtures and flooring. | 1 load | $524 |
| Work | Qty | Amount |
|---|---|---|
| Stock vanity with top, supplied and installedA stock vanity with top replaces the old one. | 1 | $867 |
| Toilet, supplied and installedA new toilet goes in at the same spot. | 1 | $373 |
| Faucet or shower valve trim, supplied and installedNew trim for the sink faucet and the tub valve. | 2 | $509 |
| Mirror or medicine cabinet, installedOne mirror or medicine cabinet over the vanity. | 1 | $274 |
| Towel bars, paper holder, hooks — setA set of towel bars, hooks and paper holder. | 1 | $139 |
| Exhaust fan with exterior vent, installedA new vented fan replaces the old one overhead. | 1 | $391 |
| Work | Qty | Amount |
|---|---|---|
| Replace angle stop / shutoff valveThree stops at the sink and toilet get replaced. | 3 | $207 |
| Work | Qty | Amount |
|---|---|---|
| Interior walls — patch, prime as needed, two coatsTwo coats on about 150 sq ft of wall. | 150 sq ft wall | $131 |
| Interior ceiling — two coats flatThe small 40 sq ft ceiling gets repainted too. | 40 sq ft | $35 |
| Masking, floor protection, and daily cleanupThe tub and floor are masked before painting. | 1 room | $67 |
Line amounts are before material handling, site conditions, project coordination, overhead and profit, and contingency. The rows below add those and reach the most likely figure.
| Materials (incl. handling) | $2,392 |
|---|---|
| Labor | $1,941 |
| Site conditionsoccupied home | $97 |
| Project coordination3 trades on one job | $665 |
| Overhead & profit | $764 |
| Contingencyfor what turns up once work starts | $586 |
| Rounding / job minimum | $5 |
| Most likely | $6,450 |
- Materials (incl. handling)37%
- Labor & site conditions32%
- Project coordination10%
- Overhead & profit12%
- Contingency9%
- Rounding / job minimum<1%
5x8 bath to the studs, same layout$20,000
| Work | Qty | Amount |
|---|---|---|
| Gut a bathroom to studs — fixtures, tile, drywall outFixtures, tile and drywall all come out to the studs. | 1 | $696 |
| Work | Qty | Amount |
|---|---|---|
| Porcelain tile, supplied and installed (standard layout)Porcelain tile over the 28 sq ft of floor the tub leaves. | 28 sq ft | $328 |
| Work | Qty | Amount |
|---|---|---|
| Debris haul-away and dump fees, per truck loadOne truck load covers the tile and old fixtures. | 1 load | $524 |
| Work | Qty | Amount |
|---|---|---|
| Repipe supply lines, per fixture servedSupply lines get redone at two fixtures while walls are open. | 2 | $597 |
| Replace angle stop / shutoff valveNew shutoff stops on three lines inside the open walls. | 3 | $207 |
| Work | Qty | Amount |
|---|---|---|
| Standard alcove tub, supplied and installedA standard alcove tub goes back in the same spot. | 1 | $882 |
| Semi-frameless shower doorA semi-frameless door closes off the tub. | 1 | $505 |
| Faucet or shower valve trim, supplied and installedOne sink faucet and one tub and shower valve trim. | 2 | $509 |
| Stock vanity with top, supplied and installedA stock vanity goes back on the same wall. | 1 | $867 |
| Toilet, supplied and installedA new toilet on the existing drain. | 1 | $373 |
| Mirror or medicine cabinet, installedA single mirror or cabinet above the sink. | 1 | $274 |
| Towel bars, paper holder, hooks — setTowel bars, hooks and a paper holder, as one set. | 1 | $139 |
| Exhaust fan with exterior vent, installedA fan vented outside, installed while the ceiling is open. | 1 | $391 |
| Work | Qty | Amount |
|---|---|---|
| Tile shower walls over waterproofingTile covers about 65 sq ft of tub surround. | 65 sq ft | $1,355 |
| Work | Qty | Amount |
|---|---|---|
| Hang, tape, and finish drywall to level 4New drywall closes about 190 sq ft of open wall. | 190 sq ft wall | $316 |
| Work | Qty | Amount |
|---|---|---|
| Interior walls — patch, prime as needed, two coatsAbout 150 sq ft of new wall gets painted. | 150 sq ft wall | $131 |
| Interior ceiling — two coats flatTwo flat coats on the 40 sq ft ceiling. | 40 sq ft | $35 |
| Masking, floor protection, and daily cleanupThe new tile and tub are covered before painting. | 1 room | $67 |
| Work | Qty | Amount |
|---|---|---|
| New outlet on an existing circuitOne outlet added beside the vanity. | 1 | $149 |
| Recessed LED can light, supplied and installedTwo recessed lights over the tub and floor. | 2 | $228 |
| Replace a light fixture at an existing boxThe light over the vanity gets replaced. | 1 | $66 |
Line amounts are before material handling, site conditions, project coordination, overhead and profit, and contingency. The rows below add those and reach the most likely figure.
| Materials (incl. handling) | $4,713 |
|---|---|
| Labor | $4,645 |
| Site conditionsoccupied home, permit likely | $511 |
| Project coordination6 trades on one job | $5,922 |
| Overhead & profit | $2,369 |
| Contingencyfor what turns up once work starts | $1,816 |
| Rounding / job minimum | $24 |
| Most likely | $20,000 |
- Materials (incl. handling)23%
- Labor & site conditions26%
- Project coordination30%
- Overhead & profit12%
- Contingency9%
- Rounding / job minimum<1%
Primary bath, tub out, tiled shower in$46,450
| Work | Qty | Amount |
|---|---|---|
| Gut a bathroom to studs — fixtures, tile, drywall outA larger room, so demo counts as two baths. | 2 | $1,392 |
| Work | Qty | Amount |
|---|---|---|
| Porcelain tile, supplied and installed (standard layout)Porcelain tile across about 90 sq ft of floor. | 90 sq ft | $1,056 |
| Work | Qty | Amount |
|---|---|---|
| Debris haul-away and dump fees, per truck loadTwo truck loads for the tub, tile and drywall. | 2 loads | $1,048 |
| Work | Qty | Amount |
|---|---|---|
| Move an existing fixture to a new locationThe shower valve and one drain move to new spots. | 2 | $1,692 |
| Replace angle stop / shutoff valveFour fresh stops at the sinks and toilet. | 4 | $276 |
| Work | Qty | Amount |
|---|---|---|
| Shower pan — mortar bed and waterproof membraneA mortar-bed pan with a waterproof membrane for the shower. | 1 | $786 |
| Frameless glass shower enclosure, measured and installedA frameless glass enclosure closes in the new shower. | 1 | $2,238 |
| Faucet or shower valve trim, supplied and installedTwo sink faucets plus the shower valve trim. | 3 | $764 |
| Custom vanity with stone top, supplied and installedA custom double vanity with a stone top. | 1 | $3,472 |
| Toilet, supplied and installedOne new toilet for the primary bath. | 1 | $373 |
| Mirror or medicine cabinet, installedOne mirror over each of the two sinks. | 2 | $548 |
| Towel bars, paper holder, hooks — setOne set of bars, hooks and paper holder. | 1 | $139 |
| Exhaust fan with exterior vent, installedOne vented fan sized for the bigger room. | 1 | $391 |
| Work | Qty | Amount |
|---|---|---|
| Tile shower walls over waterproofingTile runs about 120 sq ft up the shower walls. | 120 sq ft | $2,501 |
| Work | Qty | Amount |
|---|---|---|
| Hang, tape, and finish drywall to level 4About 260 sq ft of new drywall outside the shower. | 260 sq ft wall | $433 |
| Work | Qty | Amount |
|---|---|---|
| Interior walls — patch, prime as needed, two coatsTwo coats on about 220 sq ft of wall. | 220 sq ft wall | $192 |
| Interior ceiling — two coats flatThe 90 sq ft ceiling gets two flat coats. | 90 sq ft | $78 |
| Masking, floor protection, and daily cleanupGlass, tile and vanity are covered for painting. | 1 room | $67 |
| Work | Qty | Amount |
|---|---|---|
| New outlet on an existing circuitTwo outlets added at the new vanity. | 2 | $298 |
| Recessed LED can light, supplied and installedFour recessed lights, one of them over the shower. | 4 | $455 |
| Replace a light fixture at an existing boxTwo vanity lights replaced at their existing boxes. | 2 | $131 |
| Hardwired smoke / CO detector, interconnectedThree hardwired alarms, because permitted work can trigger updates. | 3 | $536 |
Line amounts are before material handling, site conditions, project coordination, overhead and profit, and contingency. The rows below add those and reach the most likely figure.
| Materials (incl. handling) | $10,763 |
|---|---|
| Labor | $9,747 |
| Site conditionsoccupied home, permit likely, moving plumbing | $2,437 |
| Project coordination6 trades on one job | $13,768 |
| Overhead & profit | $5,507 |
| Contingencyfor what turns up once work starts | $4,222 |
| Rounding / job minimum | $6 |
| Most likely | $46,450 |
- Materials (incl. handling)23%
- Labor & site conditions26%
- Project coordination30%
- Overhead & profit12%
- Contingency9%
- Rounding / job minimum<1%
What moves the price
Each change is priced on this sample: 5x8 bath to the studs, same layout.
| Change | Effect |
|---|---|
| It's the only bathroom in the home | adds $925 |
| Move the toilet | adds $3,425 |
| Frameless glass instead of a semi-frameless door | adds $4,100 |
| Custom vanity instead of stock | adds $6,125 |
Where these figures come from: how we price an estimate. Have bids to weigh up? How to compare contractor bids.
What's not included
- Permit fees
- Rot or leaks behind the walls
- Testing and cleanup for lead or asbestos
- Repairs to the floor framing
- Heated floors
- Custom tile work or niches
San Diego notes
- Adding circuits, replacing a water heater and installing HVAC need a permit. Swapping a switch, light fixture or receptacle doesn't. Other cities in the county run their own rules. City of San Diego permit guide
- Permitted interior work can trigger smoke and carbon monoxide alarm updates; ask your building department.
- About 48% of the county's homes were built before 1980. CSLB's guidance sets no age cutoff. Material the work will disturb is tested or assumed to contain asbestos. Census ACS 2024, table B25034 CSLB asbestos guide
- Paid work in a pre-1978 home that disturbs more than 6 square feet of interior paint in a room, and any window replacement, falls under EPA's lead-safe rule. EPA lead-safe rule questions
Common questions
How much does a small bathroom remodel cost in San Diego?
A small hall bath that keeps the tub comes to about $6,450 on our price list. Taking a 5x8 bath down to the studs comes to about $20,000.
What does a tub-to-shower swap cost?
Our primary bath sample takes the tub out, tiles a shower and moves the plumbing. It comes to about $46,450, with an expected range of $40,875 to $56,675.
Do I need a permit?
A bathroom taken to the studs usually involves electrical and plumbing work, which the City of San Diego permits separately. Other cities in the county run their own rules. Permit fees aren't in these figures.
What if it's my only bathroom?
The work takes more planning, because you still need a working bathroom. On the sample above that adds $925.
What is the project coordination row?
A job that brings several trades into the home carries the cost of running them: scheduling, supervision, protecting the rest of the home and return trips. We add 15% of the materials, labor and site conditions for each trade past the second, up to 60%, before overhead and profit. Taking a 5x8 bathroom down to the studs needs 6 trades (electrical, flooring, framing & drywall, painting, plumbing & fixtures and tile), so its row comes to $5,922.
Why will a contractor's bid differ?
A contractor sets the real price after seeing the property. Our price list starts from San Diego County wage data and shelf prices, then adds 15% overhead and profit, and project coordination on a job with more than two trades. A firm with a showroom, designers and project managers has higher overhead and can bid well above this.
Get this list for your own bathroom
Answer a few questions and send photos. The full line-by-line estimate of your own job, with your quantities, is free for now, no card needed. AI drafts the list of work; every price comes from our price list.
No sales calls unless you ask for contractor bids.